Clackamas Trolley Trail Final Design
Innovative traffic control strategies improve bicycle and pedestrian safety.
Quick Facts
Provided bikeway design and traffic engineering services to connect the cities of Milwaukie and Gladstone along a historic corridor once used by a streetcar line operating between Portland and Oregon City
The six-mile stretch of the historic rail corridor trail completes an essential link in Metro’s continuous 20-mile Regional Trail System, connecting Portland, Milwaukie, Gladstone, Oregon City and Gresham
Results
Incorporates innovative traffic control strategies at bicycle and pedestrian crossings of arterials to create a safe, non-motorized recreational and commuter trail
Our Work/ Services
Designed roadway crossing treatments, signing and markings, traffic signal controls, bike boulevard treatments, a running trail within a median, and trail crossings at busy signalized intersections
Collaborated with the design team to develop sound engineering solutions and created final design plans