Quick Facts
The project serves as one of the most popular sites on the Oregon Coast, including both the historic Dory boats and the famed Pelican Brewing
Includes improvement of lot circulation, sidewalks and pedestrian crossings, Civic Overlook seating/viewing area, new bathrooms and amenities, architectural lighting, a parking management system, and six Level 2 EV chargers
Results
Improves circulation and pedestrian safety along both Cape Kiwanda Drive and the Cape Kiwanda parking lot
Improved signage, wayfinding, and lighting
Provides EV charging infrastructure to meet both existing and future demands
Improved parking management to enhance parking conditions
Our Work
Led transportation engineering services from concept planning through design and construction
Designed multimodal transportation improvements along Cape Kiwanda Drive and parking lot to improve operations, safety, and parking conditions
Designed a targeted, low-level lighting system to balance engineering lighting guidelines with the need for low-level lighting and the County’s dark sky policy
Designed EV infrastructure to meet both existing and future demands