Two weeks before the opening, DKS worked with FDOT, Sarasota County, and Manatee County to prepare a traffic management plan. The plan included retiming the traffic signals and installing fiber optic interconnect, a surveillance camera, and a new signal controller at a critical access point. In addition, DKS developed a plan for portable changeable message signs to advise people on the most efficient way into the mall.