Quick Facts
The SW Corridor study area includes downtown Portland, Tigard, Tualatin and Sherwood
Population is growing as more people choose to live, work and play in this part of the region
The transit system is taxed; the roads are congested and unreliable
People walking and bicycling face unsafe conditions
Results
The SW Corridor Plan will result in improved travel time reliability, multimodal transportation choices, improved safety, and a high-capacity transit (HCT) system that links residents to communities throughout the region
Our Work
Served as lead traffic engineer responsible for developing transportation plan for SW Corridor
Worked with Metro, ODOT, TriMet, and local agencies
Provided transportation system network data, travel pattern summaries, and operations data to develop alternatives for multimodal improvements
Considered operational strategies to accommodate the HCT system and manage future congestion
Provided detailed operations analysis to help refine the HCT design alternatives prior to the DEIS process
Developed multimodal performance measures for the corridor